Total Pageviews

Thursday, October 3, 2013

Bought three 500GB drives today and a adapter for the internal DVD so that I can hook it up as an external drive. I hooked up a 4 port KVM switch so that I can hook up any of the 4 nodes to 1 keyboard, mouse, monitor and I am going to install a 4 port USB switch  so that I can use one DVD drive and that way I don't need to be looking behind the server for the USB ports.

I have two 500GB, one 160GB, one 250GB drives installed for a total of 1.4 TB of storage total between all four nodes.

I also want to relocate the power switch that is on the back of the server to the front. I haven't opened the server yet, but when I do I will see if it can be done.

I installed one of the GTX Titans in my other computer, but I might get a case for this computer so that all works well and install the second GTX Titan and I don't have to worry about static or any insect getting in on the motherboard.

*Microsoft still has not done anything with the donation of the Windows 2012 Data Center software. They just keep giving excuses. What a sorry ass company!! I told them to forget it.